Saturday
May232009
Milford Haven to Aberdulais High Pressure Gas Pipeline, Wales
Saturday, May 23, 2009 at 04:14PM Services: Senior Quantity Surveyor
Period: September 2004 to October 2005
Client: NACAP Land & Marine JV
Project: Design, lay and install a pipeline of approximately 120 km DN1200 48" in diameter Milford Haven to Aberdulais.
Work Packages:
- Environmental Sampling and Monitoring
- Temporary Fencing
- Site Clearance
- Pre Construction Drainage
- Topsoil Strip
- Post Construction Drainage
- Pipe Joint Coating
- Non Destructive Testing
- Cathodic Protection
Location: South Wales, UK
Value: GBP 100 million
Adrian Glave | Comments Off |