Dragon LNG Import Terminal, Wales
Saturday, May 23, 2009 at 04:59PM
Services: Senior Contracts Manager
Period: October 2005 to May 2008
Client: Whessoe Volker Stevin JV
Project: EPC for 2 x 160,000 m3 full containment LNG tanks, jetty topsides, transfer pipelines, re-gasification plant and associated facilities.
Work Packages:
- Concrete Tank Slip-forming
- Tank Post Tensioning
- Mechanical Tank Construction
- Mechanical Pipe Fabrication and Installation
- Non Destructive Testing
- Pipe and Tank Insulation
- Cathodic Protection
- Structural Steelwork
- Passive Fire Protection
- Tank Interspace Insulation
- Pneumatic Testing
- Bolt Tensioning
Location: West Wales, UK
Value: GBP 200 million